Developmental
Projects...
Development of Track
Before
30th August, 1986 i.e. prior to the take over of the management
of Shrine by the Board, the track was pot-holed, kutcha
and littered with loosely laid stones. After the take
over the entire track has been re-laid, widened, made pucca
and tiled. Sharp gradients have been improved and made gentler
at many stretches. A large number of parapets have been constructed
and railings have been provided. More than 5 Kms of the track
has been covered with rain shelters to protect the pilgrims
against the vagaries of weather.
Earlier there was hardly any illumination / lighting on the
track which now glitters with more than 1200 High Pressure
Sodium Vapour Lamps. In order to ensure availability of potable
water to the visiting devotees, 120 water points and about
20 water coolers have been installed enroute the track from
Banganga to Bhawan. Prior to take over there was hardly any
sanitary arrangements on the track. However, now about 600
latrine seats with modern flushing system have been provided
along the track and Bhawan.
|
|